Charleston Water System requires any work on our water distribution and wastewater collection systems to be performed by an approved contractor.
There are two categories of approved contractors: those approved for large projects ($50,000 - $300,000), and those approved for small projects (under $50,000). Please note that some contractors are approved for both small and large projects. Click the links below to download the lists.
Approved Contractors Lists (PDF)
Approved Contractors - LARGE Projects (Over $50,000)
Revised 5/7/2010
Approved Contractors - SMALL Projects (Under $50,000)
Revised 5/3/2011
The approved contractors lists will be revised periodically as needed.
For more information, please contact our Engineering and Construction Department.
|